Asbestos Removal in Monterey Park

A Monterey Park remodel or teardown starts with a survey. Rule 1403 of the South Coast Air Quality Management District has the building surveyed prior to any demolition or renovation, and we handle the sampling, the notice and the removal.

Monterey Park has roughly 22,100 homes, and about 17,400 of them, nearly 8 in every 10, were built before 1980. Half of Monterey Park’s homes were built in or before 1963.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and windows looking onto trees, and a doorway to a hall.

How we can help

Testing first

Before the lab can report anything, a Cal/OSHA-certified consultant or technician has to collect the samples. In Monterey Park that is the first step of a remodel, and the written report is explained on our asbestos testing page.

Heating and cooling

In Monterey Park, the wrap on the ducts, the tape at their joints and the insulation on pipes get sampled before a heating or cooling unit is swapped out. A positive result is handled under HVAC duct and pipe insulation removal.

Remodels and teardowns

A teardown or a larger remodel in Monterey Park waits on the survey. The positive material goes first, and renovation and demolition abatement walks through the district notice that goes with it.

Monterey Park housing

Monterey Park has roughly 3,900 homes from before 1950, nearly 2 in every 10, and nearly 7 in every 10 are one-unit homes.

Renters and larger buildings

Renters live in nearly 5 in every 10 Monterey Park homes, and more than 2 in every 10 belong to buildings of five or more units. Tell us the building type on your call, because the small-job survey carve-out is for houses only and leaves out apartment buildings, townhouses and condominiums.

Permits in Monterey Park

Monterey Park’s demolition requirements page says the contractor gives the building department a copy of the district notification at the time the permit for the renovation or demolition is obtained. On our jobs we file the notice online and give you that copy for the building department.

The city adds that enforcement of the district’s rules is not within the building department’s jurisdiction. Confirm your address with the district at (909) 396-2336.

Attic with silver-gray wrapped round ducts running along the rafters, plank flooring and loose insulation along both sides.

Frequently asked questions

Does a Monterey Park permit need the district notice?

The city says the contractor gives the building department a copy of the notification when obtaining a renovation or demolition permit. The notice itself goes to the district, no later than 10 working days before the work, whenever one is required.

Do small renovations need the survey?

A small renovation of a house can fall outside the survey requirement, but only if it removes or strips asbestos-containing material across less than 100 square feet of surface area and the dwelling is a residential single-unit one. Demolition never qualifies, and our asbestos testing page has the detail.

What does a removal contractor need?

Ask for two things when a job reaches 100 square feet or more of material. One is a license number that the Contractors State License Board can confirm, showing the C-22 Asbestos Abatement classification or a qualifier who has passed the asbestos certification examination. The other is the employer’s Cal/OSHA registration.

Where does the waste go?

Only friable, powdered or finely divided asbestos falls under the state hazardous waste rules. If yours is in that state, a licensed hauler takes it away with a manifest. Your household bin is never the answer.

Commerce has its own page, and the home page lists every service.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 662-5039

Call (562) 662-5039