Example Asbestos Removal Projects in Florence-Graham

The seven example jobs below are set in Florence-Graham, Commerce and Monterey Park. Each one lists what was sampled, what came out, the work days and an estimated cost.

Kitchen floor and wall compound removed before a porch is enclosed as a bedroom

Example project

Home
1920s bungalow in Florence-Graham, an unincorporated community, with a sheet-floored kitchen and a rear porch
Original request
Enclose the porch as a bedroom and open a doorway through the kitchen wall under an alteration permit
Testing
A Cal/OSHA-certified asbestos consultant samples the kitchen flooring, the wall compound at the new opening and the porch ceiling
Found
Asbestos in the flooring backing and the wall compound
Clear
The porch ceiling
Area
About 120 sq ft of floor and 90 sq ft of wall
Timeline
If the address is in the district’s area, notice no later than 10 working days ahead, then three working days
Cost
$3,600

Scope of work

Samples of each material, the kitchen sealed with air filters running, the flooring and the compound at the opening removed wet, bagging and the haul. The clearance air test, the county permit, the framing and the new finishes are separate.

Project overview

In this example, an owner in Florence-Graham is turning the rear porch of a 1920s bungalow into a bedroom. The community is unincorporated, so the alteration permit comes from the county’s Public Works Building and Safety office. The county permit form has an asbestos box, where the applicant says the notification was sent or that it does not apply.

The kitchen flooring backing and the wall compound test positive, and the porch ceiling is clear. If the address falls inside the district’s area, the abatement contractor files the notice online, and the crew takes out both materials before the framers open the wall.

The goal

The goal is a kitchen with the positive floor and wall material gone before the alteration begins.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the kitchen floor, the wall and the porch ceiling.
  2. Before work The owner fills in the asbestos box on the county permit form, and the contractor files the district notice online if it applies.
  3. Days one to three The kitchen is sealed, the flooring comes up and the compound at the opening is removed wet.
  4. Last An independent consultant tests the air before the framers start.

Planning right

  • Ask the county counter what the permit form needs from you.
  • Keep the lab report with the permit papers.
  • Plan where to cook while the kitchen is sealed.
  • Hold the framing date until the air results.

Get a free quoteMore about renovation and demolition abatement

Spray texture removed from four rooms with the notice copy filed at the permit counter

Example project

Home
1960s house in Monterey Park with spray texture on the ceilings of the living room, hall and two bedrooms
Original request
Rewire and add new lights in those rooms under a renovation permit
Testing
A Cal/OSHA-certified asbestos consultant samples the texture in each room
Found
Asbestos in the ceiling texture of all four
Clear
The plaster walls
Area
About 700 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$5,800

Scope of work

Samples from each room, the district notice, each room sealed in turn, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test, the rewiring and the new ceiling finish are separate.

Project overview

In this example, a Monterey Park owner is rewiring four rooms of a 1960s house and adding lights. The renovation needs a building permit, and the contractor gives the building department a copy of the district notice when the permit is picked up.

The texture tests positive in every room. The abatement crew clears the ceilings before the electrician cuts in, so the new fixtures are set in clean ceilings.

The goal

The goal is four ceilings free of positive texture, with the notice paperwork in order for the permit.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceilings room by room.
  2. Before work The contractor files the district notice online and gives a copy to the building department with the permit.
  3. Days one to three Each room is sealed and the texture is soaked and scraped off.
  4. Last An independent consultant tests the air, then the electrician begins.

Planning right

  • Bring the notice copy and the lab report when you pick up the permit.
  • Clear the four rooms of small furniture and wall hangings.
  • Mark where the new lights go.

Get a free quoteMore about popcorn ceiling removal

Sheet flooring and adhesive removed from two rooms before new tile

Example project

Home
1950s house in Commerce with sheet flooring across the kitchen and dining room and ceramic tile in the entry
Original request
Lay new tile through the kitchen and dining room
Testing
A Cal/OSHA-certified asbestos consultant samples the flooring backing and adhesive in both rooms and the entry tile
Found
Asbestos in the flooring backing and its adhesive
Clear
The entry tile
Area
About 240 sq ft of floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,300

Scope of work

Samples, the district notice, the two rooms sealed with air filters running, the flooring lifted and the adhesive removed wet, bagging and the haul. The clearance air test and the new tile are separate.

Project overview

In this example, a Commerce owner wants new tile through the kitchen and dining room of a 1950s house. The sheet flooring is glued to the subfloor, and the owner wants to know what is in it first.

The backing and the adhesive test positive and the entry tile is clear. The abatement crew removes both rooms of flooring in one visit, and the tile setter starts on a clean subfloor.

The goal

The goal is a bare subfloor in both rooms, so the new tile sits on nothing that tested positive.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the flooring and the entry tile.
  2. Before work The abatement contractor files the district notice online.
  3. Day one Both rooms are sealed, the sheet flooring is lifted and the adhesive is removed wet.
  4. Day two The subfloor is cleaned and an independent consultant tests the air.

Planning right

  • Empty the cabinets along the dining room wall.
  • Leave the entry tile in place.
  • Hold the tile delivery until the air results.

Get a free quoteMore about floor tile and mastic removal

Whole-house survey before a rear second unit ties into the old house

Example project

Home
1920s bungalow in Florence-Graham, an unincorporated community, on a lot with room for a second unit at the back
Original request
Build a small unit behind the house, with its utilities tied in through the old kitchen and bathroom walls
Testing
A whole-house survey by a Cal/OSHA-certified asbestos consultant, about 12 samples from ceilings, floors and walls
Found
Asbestos in the kitchen flooring layer and the bathroom wall compound
Clear
The ceilings and the other rooms
Timeline
Samples, then lab results, then a written report
Estimated testing cost
$900

Scope of work

A visit by the consultant, about 12 samples, a lab result for each and a written report with a sample plan. The abatement and the new unit are priced separately.

Project overview

In this example, an owner is adding a second unit behind a 1920s bungalow. The new unit’s plumbing and wiring tie into the kitchen and bathroom of the old house, and the permit comes from the county because the community is unincorporated.

The kitchen flooring layer and the bathroom wall compound test positive. The report lists every sample, and the owner books the abatement crew for those two spots before the plumber opens the walls.

The goal

The goal is a written list of what is where in the old house, so the new unit is tied in with a plan.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the rooms the new unit will touch and a few others.
  2. Results The lab reports each sample, with two positive materials and the rest clear.
  3. Next The abatement crew is booked for the kitchen floor and the bathroom wall.
  4. Then The plumber and the builder get their dates.

Planning right

  • Please do not open the walls before the report arrives.
  • Show the consultant where the new lines will run.
  • Keep the report with the plans for the new unit.

Get a free quoteMore about asbestos testing and surveys

Old pipe insulation removed ahead of a bathroom remodel in a rented bungalow

Example project

Home
1940s rented bungalow in Florence-Graham with older wrapped water lines under the bathroom
Original request
The landlord is replacing the supply and drain lines as part of a bathroom remodel
Testing
A Cal/OSHA-certified asbestos consultant samples the pipe wrap at three spots and the compound behind the tub wall
Found
Asbestos in the pipe wrap
Clear
The wall compound
Area
About 40 ft of pipe
Timeline
Less than 100 square feet of asbestos-containing material removed, so no district notice, then one working day
Cost
$1,600

Scope of work

Samples, plastic around the bathroom and the access panel, the pipe wrap removed wet and bagged, a cleanup and the haul. The clearance air test, the plumbing and the remodel are separate.

Project overview

In this example, a landlord in Florence-Graham is remodeling the bathroom of a rented 1940s bungalow. The district’s owner-occupant provision does not reach a rental, because the owner must live there and do the work.

The pipe wrap tests positive and the wall compound is clear. The abatement crew takes the wrap off the old lines in one visit, and the plumber works on bare pipe.

The goal

The goal is old lines without positive wrap, so the plumber replaces them without disturbing it.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap at the access panel and the tub wall.
  2. Results The wrap is positive and the wall compound is clear.
  3. Work day The access panel is sealed in plastic, and the wrap is wetted, cut off and bagged.
  4. Then The plumber starts the new lines.

Planning right

  • Tell the tenant which day the bathroom is closed.
  • Ask the plumber to wait for the work day.
  • Keep the lab report in the property file.

Get a free quoteMore about HVAC duct and pipe insulation removal

Plaster skim coat removed from a living room ceiling after a roof leak

Example project

Home
1920s house in Florence-Graham with a plaster and lath ceiling in the living room, stained by an old roof leak
Original request
Take down the damaged section and hang new drywall in its place
Testing
A Cal/OSHA-certified asbestos consultant samples the skim coat and the base plaster at three spots
Found
Asbestos in the skim coat
Clear
The base plaster
Area
About 80 sq ft of ceiling
Timeline
Less than 100 square feet of asbestos-containing material removed, so no district notice, then one working day
Cost
$1,900

Scope of work

Samples, plastic around the room, the damaged section taken down wet with its skim coat, bagging, a HEPA clean and the haul. The clearance air test and the new drywall are separate.

Project overview

In this example, the owner of a 1920s house has repaired a roof leak and wants the stained plaster ceiling replaced. The plaster may carry more than one layer, so the owner has each one sampled.

Only the skim coat tests positive. The abatement crew takes the damaged section down wet, and the drywall hanger works after the cleanup.

The goal

The goal is a ceiling opening with the positive skim coat gone, ready for new drywall.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the skim coat and the plaster beneath it.
  2. Results The skim coat is positive and the base plaster is clear.
  3. Work day The room is sealed and the section comes down wet.
  4. Then The drywall hanger is booked.

Planning right

  • Take the lamps and rugs out of the room.
  • Mark the stained area for the crew.
  • Keep the report for the drywall hanger.

Get a free quoteMore about drywall, joint compound and plaster removal

Small house cleared of positive materials before demolition, with the district receipt for the county

Example project

Home
Small 1940s house of about 850 sq ft on a narrow lot in Florence-Graham
Original request
Take the house down and build a new one on the same lot
Testing
A whole-structure survey by a Cal/OSHA-certified asbestos consultant, about 16 samples from ceilings, floors, walls and the furnace closet
Found
Asbestos in the ceiling texture, the kitchen and bath flooring and the wall compound
Clear
The roofing felt
Area
About 800 sq ft of ceiling, 300 sq ft of floor and 450 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then five working days before the wrecking crew
Cost
$17,000

Scope of work

Removal of every positive material in the survey, the district notice, rooms sealed in turn, wet removal into labeled bags and the haul with its paperwork. The survey, the clearance air test, the demolition itself, the permits and the new house are separate.

Project overview

In this example, an owner is replacing a small house on a narrow Florence-Graham lot. Demolition always needs the district notice, and county practice is to see a receipt showing the district got it before the demolition permit is issued.

The survey comes first, the positive materials come out, and the wrecking crew starts afterwards. The receipt goes to the county with the permit application.

The goal

The goal is a house with every positive material gone and the paperwork ready, so demolition starts when the county issues the permit.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the furnace closet.
  2. Before work The contractor files the district notice online, and the receipt goes into the county permit file.
  3. Days one to five Room by room the ceilings, floors and wall compound come out wet and leave in sealed bags.
  4. Last An independent consultant checks the air, and the wrecking crew starts.

Planning right

  • File the notice well ahead of the date you want the permit.
  • Keep the receipt and the lab report together.
  • Ask the wrecking crew to wait for the air results.
  • Leave room at the curb for the work truck.

Get a free quoteMore about renovation and demolition abatement

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.