Joint compound and tape
Seams are finished with joint compound, and it is sampled with the sheets it covers. The result shows whether the seams, the sheets or both need asbestos work.
Typical cost in Florence-Graham
Plaster over wood lath, drywall and the joint compound on its seams are sampled before a wall or ceiling is opened here, and so is whatever sits inside the cavities, as necessary to identify and sample it. Material that tests positive is removed ahead of the remodel crew, and the report with the results goes to your contractor.
The South Coast Air Quality Management District’s Rule 1403 calls this survey for renovation as well as demolition. Plaster over wood lath is sampled the same way as drywall and its joint compound.

Seams are finished with joint compound, and it is sampled with the sheets it covers. The result shows whether the seams, the sheets or both need asbestos work.
Plaster over wood lath is sampled the same way as drywall. If the sample is positive, we remove it with the work area sealed off.
A remodel that opens a wall is a renovation under the rule, so the survey comes first, unless the small single-unit renovation carve-out applies, and removal follows if a sample is positive.
A bearing wall carries load, so taking it out is demolition in the rule, not renovation. Every demolition needs the district notice, which makes a structural wall the point where a remodel’s paperwork changes.
Tell us which walls and ceilings your plans touch when you call. That decides which materials are sampled and how the work area is sealed off.
Give your electrician and finisher a copy of the survey report before they start, so they know which materials were sampled.
Walls begin with asbestos testing. Our other services are on the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 662-5039